Skip Ribbon Commands Skip to main content
/en-us/why-hurco/success-stories/blog/Lists/Photos/testimonials/dry-milling-action-shot.jpg
 
 

Belkin Corporation - Hurco VM Mill Invaluable for Prototyping Needs   

/en-us/why-hurco/success-stories/blog/Lists/Photos/VM2WinMaxWDimensions.jpg

​“In the fast changing world of computer peripherals, innovative design is the key. Rapidly converting these designs into prototypes requires a high capability machine tool. When compared to the competition, Hurco’s VM machining center won hands down.”

―John Hoppe, 3D Lab Manager
 

--------------------------------------------------------------------------------
 
 
When John Hoppe was granted a budget to buy a VMC to create prototypes in his lab, he contacted four different builders with machines in his size and budget range. He asked each to cut a 3D surface part using a tool path he had generated on Pro/Manufacturing. He knew that if he controlled the data used in the test, he would have the best chance to evaluate actual machine performance -- what he could really expect to get in his shop.
 
Hurco’s VM2 Comes Out On Top 
When all the samples were submitted and checked, Hurco’s VM2 machining center achieved the best surface finish with the fastest cycle time. Given its very competitive starting price of under $50,000 and its small footprint of 40″ of X travel, the decision to buy the VM2 was easy.
   
Equipped with an optional 10,000 RPM spindle, the VM2 provides cutting feed rates up to 600 IPM for fast prototype machining. The Hurco Max control is network compatible and the program changes can be rapidly downloaded from the design group. Downloads can be made even when the machine is processing a different part. With a substantial hard drive, even huge programs can be stored for later use. The control’s RAM was expanded to 256 MB to handle very large programs without the need for drip feed or other time consuming steps. 
   
Since the Max control is equipped for automatic machine shutdown after program completion, the VM2 is ideal for lights out extended shift operations. Many programs run all night and are ready for evaluation the next morning.

 

Summary
Mr. Hoppe has found the Hurco VM2 invaluable in helping him meet the prototype needs of the design team. Schedules are not only met, but exceeded while critical inputs on fit, feel, and assembly can aid in the cutting the project team’s cost. When the design is finalized, the complete design in Pro-Engineer software can be transmitted to suppliers around the world. Working in the design studio and using Hurco’s VM2 machining center has allowed Belkin to produce its prototypes even more quickly and efficiently than before.